Gordian Logo RSMeans Data from Gordian

Blog: Blog

Learn how to calculate a JOC Adjustment Factor

How to Calculate a JOC Adjustment Factor

Learn best practices for creating a JOC Adjustment Factor, including prices to include and exclude, and practice developing factors with our JOC Adjustment Factor calculator.

7 Data Points on Military Housing Conditions 3

7 Data Points on Military Housing Conditions

The Department of Defense (DOD) has recognized military housing conditions as an area of need across its branches. Read this blog post for a high-level look at the problem and potential solutions.

Estimating Software: A Powerful Value Engineering Aid 4

Estimating Software: A Powerful Value Engineering Aid

Preconstruction professionals may use any number of tools to inform their value engineering analysis. But one tool stands above the rest: construction estimating software. Find out why and what features to look for when choosing an estimating software in this blog post.

Upcoming Domestic MILCON Investment Priorities 5

Upcoming Domestic MILCON Investment Priorities

Military branches across the DOD and DHS are planning sizeable investments into their CONUS assets, from upgrading military housing to electrifying vehicle fleets to rebuilding shipyards. Read about upcoming MILCON investment priorities in this blog post.

Scroll to Top